A new education facility for Birmingham City University – STEAMhouse 2 –  marries the restored frontage of a former Victorian industrial building with a brand new addition designed to promote interdisciplinary courses that bring together artists, scientists and engineers with input from industry.

The locally-listed red brick and terracotta façade of the 1899 Belmont cycle works was

preserved after a disastrous fire gutted the building in 2007.

That now fronts a new brick building the rear elevation of which boasts Corporate W20 windows in black plus two fire-rated Crittall windows and two fire-rated Crittall doors installed in a fire escape.

Beyond this is a new four and five-storey building comprising workshops and teaching spaces. The new and reconstructed buildings are linked by an open central space, beneath a transparent roof, to encourage interaction between students and trainees attending the new STEM (Science, Technology, Engineering and Mathematics) – based university courses on offer.

The Crittall profiles are sensitive to the industrial heritage of the original building while complementing the 21st century ethos underpinning the STEAMhouse’s ambitions.

Start your Crittall Journey Discuss your project